Children’s Hospital – San Diego, CA Dr. Glenn Billman (Medical Safety Officer) |
| “We are excited to be the first partner of Isensix. Several staff members have reported to me how invaluable your system has become in our organization in such a short time. In fact, it was just reported to me that the ARMS™ system has already saved a potential loss of over $75,000 due to your system’s early warning capabilities. Isensix is addressing the twenty year old medical problems that no one has ever been able to crack. This is a huge breakthrough." |  |
| "We just had a State Agency visit and they were quite happy that we’re taking proactive measures to improve our safety management with such a wonderful system. I’m very impressed with what Isensix has already shown and can’t wait to expand to include other areas.” |
UCLA Medical Center – Los Angeles, CA Dr. David A. Bruckner, ScD (Chief, Division of Pathology & Laboratory Medicine) |
| "Our first contact with Isensix carried with it an extraordinary promise. We were assured their system would quickly and dramatically raise the bar technologically, while significantly lessening the impact financially,” a notion unheard-of in our industry. And now, after the fact, the result far exceeds our highest expectations. |  |
| Not only will our organization save a substantial amount of money each and every year, but the technology itself is proving to be light-years ahead of anything we have seen in terms of accuracy, usability, and scalability. I am certain the Isensix system will rapidly be embraced as the gold standard for healthcare facilities around the world." |
National Genetics Institute – Los Angeles, CA Mike Aicher(President) |
| "When the end result of your work requires a process that depends on precise quality control and strict reliability, it is imperative to eliminate human error wherever possible. The Isensix Virtual Sensor Network system has enabled us to now employ state-of-the-art technology for the purpose of monitoring key, sensitive, temperature-dependent storage facilities in our lab. We are enormously pleased with the results to date, and over the next year we intend to extend our initial installation to cover additional necessary areas of our testing facility." |  |